Which pipe is better for drainage when constructing an access to a site: overview of all options + step-by-step installation in a ditch

Friends, hello! I have one neighbor in my dacha. And there is a ditch in front of the entrance to the site. So, about two years ago, he decided to redo the entrance and hired a crew to lay the pipe, bury it and improve it.
Two years later everything was a blur. Again he decided to redo it, but now he came to me for advice. In general, I went and looked at what happened there. Then we sat down with him and over a cup of tea I told him how to choose the right pipe, what slope to make and, in general, all sorts of nuances and points to control the team that will do all this.

Then, when he left, I decided to write an article for the site. Maybe it will be useful to someone. Read, share on social networks.

Options for pipes in the ditch at the entrance to the site and rules for their installation

It is advisable to lay a drainage pipe at the entrance to the site, since property owners often dig a hole around the perimeter of the territory to collect and drain rain and melt water.

The ditch located at the entrance to the site is an obstacle because it cannot be filled in, because it is needed to remove sediment from the road and prevent waterlogging.

But at the same time it interferes with the passage of vehicles. If a pipe is laid in a ditch for a drive-in, the system will perform its function without interfering with traffic.

How to drive onto a site with a slope

If there is a slope in one direction or another between the site and the road, the drive is planned taking into account the angle of the inclined plane. During construction work, all options must be provided to prevent spontaneous movement of the machine downhill and sliding in the event of icing.

With a large inclination, if possible, the trajectory is extended and curved as much as possible. Or they arrange a flat area in front of the gate. It is recommended to provide sloped driveways with canopies to protect them from precipitation. Thus, there is a chance that it will be possible to avoid icing in winter. Such structures are assembled from wood and metal. The covering is chosen to suit every taste: corrugated sheets, slate, soft tiles or polycarbonate.

Modern technologies make it possible to install a heated floor system directly at the entrance. It is additionally treated with waterproofing materials. During the cold season, this method prevents the formation of ice.

If the road is higher than the site, it is necessary to provide additional traction for the wheels of the car to avoid automatic rolling.

Features of choosing a pipe in a ditch for a drive

It is very important to choose the right type of pipe products. In this case, you need to rely on what load the product can withstand.

There are several options, each of which should be familiarized with:

  • concrete;
  • reinforced concrete drainage system;
  • corrugated plastic construction;
  • steel drainage system;
  • plastic products.

The concrete product has a drawback - over time it begins to collapse. Crossings with reinforced concrete pipes are durable and reliable, but strict adherence to installation technology is required. One of the main advantages is its large size and, accordingly, significant throughput.

Before creating a structure made of reinforced concrete, it is necessary to lay a sand cushion. It is advisable to make its top layer from crushed stone and sand.

In this case, the risk that the structure will break under the influence of gravity is minimized. The main disadvantage of reinforced concrete is labor-intensive installation.

The drainage structure made of this material is quite popular; its disadvantages include its heavy weight and high price.

Corrugated plastic pipes for ditch are lightweight, affordable, reliable, resistant to deformation and rust. They have high capacity, are easy to install, are safe and can support significant weight.

They are also characterized by high ring rigidity. You will not have to spend a large amount of money for installation, for the reason that this does not require auxiliary equipment. You can do the work yourself.

Advantages and disadvantages of materials


Unlike concrete, plastic products are inexpensive and lightweight.
They are not subject to corrosion, breakage and last for many years. Therefore, a plastic pipe in a ditch does not cause problems during installation and makes it possible to save on work. However, it is highly not recommended to use used plastic pipes when creating a drainage system - they may not withstand the weight of heavy vehicles, for example, a truck.

A distinctive feature of steel drainage structures is reliability and strength. However, they also have a drawback - they are susceptible to corrosion, which destroys the pipes.

Despite this, the service life is quite long. These products are able to withstand impressive weight, and installation does not require the intervention of specialists. Pipes with thick walls, despite the influence of corrosion, can last for many years.

When choosing a pipe for a ditch to enter a site, you need to pay attention to strength, weight and other characteristics. As in the case of plastic products, it is highly not recommended to buy used pipes - their service life will be shorter.

Corrugated pipe products with large diameters are also available on sale. The product is made in such a way that the structure is able to withstand heavy loads, and its service life is very long.

Plastic is not susceptible to corrosion and the influence of aggressive substances. Installation of such pipes is easy. A big plus is the low cost of the products.

Advantages of plastic pipe products:

  • High temperature resistance. The operating mode for them ranges from -20 to +70 degrees, although the maximum range is from – 60 to + 100 degrees.
  • Good chemical resistance. Therefore, they are used for industrial wastewater.
  • Impact resistance. This is especially important at temperatures below 0 degrees. A corrugated pipe in a ditch is much preferable to a smooth one in case of transportation and installation in the winter season.
  • High ring stiffness. This indicator is at least 8 kN/m2, which corresponds to operational class T. The products are suitable for installation under highways and heavy soils.
  • Convenient and inexpensive transportation. This is possible due to the low weight of polypropylene pipes.
  • Easy installation. Corrugated double-wall pipes can be easily connected to smooth-walled PP and PVC pipes. They can be attached to concrete and polymer wells. Installation can be done without heavy lifting equipment.
  • Easy cutting. A polypropylene plastic pipe in a ditch for entry can be successfully cut with a regular saw.
  • The service life of the products reaches 50 years.

Sometimes site owners themselves create access structures for ditches. In this case, take a standard large-diameter plastic pipe and place it in the hole.

Afterwards, a belt is arranged around the product - to create it you will need a reinforcing mesh. The structure is then filled with concrete. The duration of operation will be several decades, and the price of the structure will be low.

Types of pipes

Ditch pipes are made from various materials. When choosing elements of a drainage pipeline, you need to pay attention to their characteristics, strengths, and weaknesses.

Metal

Made from steel. Advantages:

  • high strength and wear resistance;
  • service life - 40 years;
  • availability of large diameter products.

The main disadvantage of steel tubes is their low resistance to prolonged exposure to moisture. Because of this, over time, rust forms on their walls. Gradually the walls are destroyed, the pipeline becomes unusable.

Steel parts are suitable for installing drainage drains under the entrances to a summer cottage. Thick walls withstand high pressure and therefore do not deform after cars passing on top.

Concrete Advantages of concrete pipes for ditch:

  • high strength;
  • resistance to environmental influences and corrosion.

The disadvantages of concrete tubes include their heavy weight and installation difficulties (the help of other people is needed). Over time, concrete walls are destroyed and this process is irreversible.

Reinforced concrete

These are structures that consist of a metal frame filled with concrete. Then the product is placed in a centrifuge and vibropressed. This is necessary to compact the concrete structure.

The main disadvantage of reinforced concrete pipes is that they can crack under heavy load. To prevent this, you need to make a special sand cushion before laying the pipes.

Plastic

They are corrugated elements of drainage pipelines that are gradually replacing metal ones. Advantages:

  • resistance to external factors;
  • plaque and dirt do not accumulate on smooth walls;
  • plastic is not susceptible to rust;
  • durability under normal conditions;
  • simple installation that can be done independently without the use of specialized equipment;
  • are not destroyed under the influence of various chemicals.

The disadvantages of plastic tubes include their low resistance to mechanical stress. They can crack under heavy weight.


Plastic pipes (Photo: Instagram / sdscenter1)

Installing pipes in the ditch at the entrance on your own

You can cope with this work yourself. To do this you will need the following materials and tools:

  • drainage structure;
  • crushed stone;
  • sand;
  • shovel;
  • materials for wrapping the product.

Water will only flow through the pipe. If it flows through the embankment, then after some time the soil will be washed out, the embankment will collapse and the work will have to be done again.

First, a trench of a suitable size is prepared, into which sand about 10-15 centimeters thick is poured. This creates a protective layer for the structure. Afterwards, a special material is laid for wrapping the products.

Crushed stone 10 centimeters thick is poured on top. And only after this a drainage structure is installed. It is usually discharged into a nearby ditch or sewer system.

The next layer is crushed stone again, but already 15 centimeters thick. Next, wrapping material is used and sand is poured. At the last stage, the structure is covered with earth.

Laying plastic pipes under the road does not require much time. The work is not difficult, you do not need to have any special skills or abilities. However, if the weight and size of the pipes are significant, special equipment may be required.

Source: trubaspec.com

Selecting and laying pipes in a ditch for a check-in?

The laying of drainage sewerage under surfaces with high traffic load (a special case is a pipe in a ditch at the entrance to the yard) must be carried out in compliance with certain requirements.

Incorrect choice of material and errors during installation work can lead to a decrease in the amount of groundwater and precipitation passing through the system, cause erosion of the road surface and cause emergency situations.

Materials for installing drainage through the entrance to the courtyard


When choosing which pipe to put in the ditch separating the roadway from the courtyard, you first need to find out about its ability to withstand significant loads.
Even if you only have passenger vehicles, you cannot exclude the possibility of having to drive a KAMAZ loaded with construction materials into the yard. Therefore, the first rule requires choosing pipes with maximum rigidity and load-bearing capacity.

Today, you can choose structures from various materials that can organize efficient and safe passage of water through the embankment before entering the courtyard.

The most commonly used options are:

A metal drainage pipe into a ditch - such a device has been used for quite a long time. Even taking into account the tendency of metal to corrosion, such culverts can last 30-40 years.

This is explained by the fact that thick-walled elements of large diameter are used for these purposes, and additional waterproofing of the pipe can provide reliable protection against corrosion.

The main advantage of the material is its ability to withstand significant loads. Such a pipe will not be pinched even when passing heavy loaded equipment.

Concrete driveway pipes are no less often used, allowing large amounts of water to pass through without causing damage to the road surface. Such elements have significant weight, so installing them in domestic conditions is not always advisable, as this will entail additional costs for lifting equipment.

It is much easier to install homemade reinforced concrete pipes in a ditch. To do this, you will need an ordinary plastic sewer pipe (it is better to choose the largest diameter, or use several pipes, it depends on the expected water flow in the ditch).

Installation of such a water flow system is carried out as follows. Plastic pipes are laid on the prepared base, which will act as a kind of sleeve.

A reinforcing frame made of a metal rod is tied around the pipes; it is desirable that it be located around the entire surface of the main plastic element. In this case, after pouring the concrete, you will get a monolithic structure that can withstand significant loads.

A concrete pipe into a ditch can be replaced with reinforced concrete trays, but this is only possible at shallow depths. Such trays are covered with decorative grilles and are often used as elements of landscape design.

The installation of such a system is especially relevant for the drainage of rainfall through the road surface. It should be noted that such structures can be fragile, so their installation is quite labor-intensive and requires the use of special techniques for installing the structure. Typically, the installation technology is recommended directly by the manufacturer of such reinforced concrete products.

Today, the best option to arrange the entrance to the site through a ditch is to use special corrugated drainage pipes.

Why are drainage ditches needed?

A drainage ditch is needed to drain surface water after heavy rainfall, snow melting and from existing springs. In this case, shallow ditches are made that have a slope towards water drainage. They protect the roadway and adjacent land from destruction due to water flow. And also from the appearance of holes and potholes on the road and ravines in the surrounding area.

The depth and width of the ditch are selected sufficient to ensure the throughput of flowing water. Typically no more than 1 meter deep and 2 meters wide.

To drain wetlands, deeper canals are dug. The slope in them may not be observed. Water accumulates in the channel and evaporates. The deeper the canal, the lower the groundwater level will drop and a larger area will be able to be drained. There may be no slope for water drainage, especially if this area is located in a lowland and there is nowhere to drain the water. Sometimes they make an artificial pond with a canal connected to it. The depth of the channel can reach 2–3 meters, width up to 5.


Drainage channel for draining the area

The use of plastic drainage pipes for driveways

Corrugated plastic pipe in a ditch can be used even under significant loads.

The profile of its cross-section makes it possible to distribute all the forces created during external influences over the entire surface of the product. Thanks to this, the load-bearing capacity of such a pipe is significantly increased.

In addition, such elements have other advantages over concrete and metal structures:

  • Light weight with significant load-bearing capacity and strength.
  • Simple installation technology; there are a variety of fittings that simplify the assembly of the line.
  • Low cost compared to other elements.
  • Resistant to corrosion and aggressive liquids.
  • Such a pipe through a ditch will last at least 50 years (if the installation technology is followed).

Metal culverts

Metal structures have a corrugated body and are the most durable. Such culverts can withstand enormous loads, however, such pipes have one big drawback - they are susceptible to corrosion.

Metal pipes are susceptible to corrosion, so they are used as temporary structures

Helpful information! Due to rusting, metal culverts are typically used as temporary structures.

The most popular use of such pipes is a temporary passage under a highway. Passages are made to drain water from one side of the road to the other. This need often arises in the event of a blockage or collapse of the main culvert. In addition, a metal pipe can be used as a protective case for a polymer pipeline that is resistant to corrosion.

Corrugated iron culverts are also used to reinforce the walls of boreholes. Sometimes a permanent structure is still installed from such pipes, however, this happens extremely rarely.

Metal drainage channels are assembled from individual segments. Assembly is usually carried out at the installation site. It is also worth noting that such pipes can have almost any finished shape. This is due to the fact that they have corrugated walls that can bend. If the metal sheets have a protective anti-corrosion layer, this design can last up to 50 years. The cost of installing a metal drainage channel is 20–30% lower than a reinforced concrete one.

Rules for laying pipes through a ditch

First of all, you need to understand one simple truth - the design of the drive through the ditch should ensure the passage of water only through the drainage pipe. Water seepage through the embankment material will lead to erosion of the road surface and the occurrence of emergency situations.

Laying the pipe in a trench (ditch) must be carried out in the following sequence:

  • The walls of the ditch are leveled, it is advisable to make the slopes inclined.
  • At the bottom, preparation is made for a drainage pipe. In the simplest case, it could be a sand cushion, but it will be better if you decide to pour a footing (a reinforced concrete base with a thickness of at least 10-15 cm).
  • The pipe is laid on the prepared base and sprinkled with crushed stone, a layer of about 30 cm, in this case it is worth using granite material of medium fractions.
  • The bulk of the ditch crossing should be made of a waterproofing material such as clay. In this case, it is necessary to compact the soil. Therefore, before laying the pipe in a ditch, make sure you have a supply of material and devices for tamping.
  • Before laying the roadway, it would be a good idea to install a layer of high-density geotextile. It will help redistribute the load created by transport over the entire area of ​​the lintel in the ditch. The embankment slopes can be reinforced with the same material.
  • At the end of the work on constructing an entrance to the site through a ditch, additional protection of the embankment can be provided. This can be done by simple concreting, laying turf or any other available methods.

Whatever material the pipe for entering the site is made of, when choosing, the main thing is to correctly determine its cross-section. It should ensure the free passage of groundwater and rainwater at their maximum intensity.

In addition, measures should be taken to prevent the formation of blockages in the pipe, which is especially important for large passage widths. Water flowing in a ditch usually carries with it mountains of debris; the easiest way to trap it near the pipe is to install decorative grilles.

Preference should be given to metal products, they have increased strength. It is quite easy to remove blockages formed at the mouth of the pipe using a shovel.

The use of plastic corrugated pipes together with geotextiles is the easiest way to construct an embankment through a ditch to enter the site.

HDPE pipes are able to withstand the load even from loaded vehicles, while ensuring the free passage of water through the body of the embankment.

Source: vsetrybu.ru

Installation nuances

Work on digging a pit is carried out using special equipment, however, leveling the walls of the pit is done manually (using shovels). If the soil at the bottom of the pit is unstable and soft, it is paved with cobblestones. It is laid over the entire area of ​​the bottom of the pit using special tools.

Preparing a pit for pipes is carried out using equipment

Digging a pit is carried out without installing special fences, but in some cases fences are still necessary. For example, if water runoff can get into the pit. Quite often, workers are faced with the need to strengthen the walls of a pit. Such strengthening is carried out taking into account building codes and safety rules in cases where there are residential or industrial buildings near the pit being developed.

The dimensions of the pit, as a rule, depend on the specific case and are determined taking into account the diameter and cross-sectional shape of the culvert. The slope angles of such a design are directly dependent on the properties of the specific soil under which installation work is carried out.

Important! When constructing a pit for a culvert, it is necessary to foresee and conveniently plan the location of the pipe in advance, so that in the event of a breakdown, the culvert is available for repair work.

To carry out work on installing a waterproofing coating or anti-corrosion protection, you need to remember one important rule - the distance between the walls of the foundation and the walls of the pit should not be less than 70 cm. This is necessary for the convenience of performing the work, because these procedures are carried out by workers. If the use of people is not mandatory, this figure is reduced to 10 cm. It is also worth noting that if there is no need to arrange a foundation, the pit for the culvert is dug exactly according to the dimensions of the pipe.

Which pipe is better for drainage when constructing an entrance to a site: an overview of all options

Hello, dear readers! A ditch at the entrance to the courtyard of a private house or cottage performs an important function. It is into it that rain and melt water flows, which can damage the road surface of the roadway.

The pipe in the ditch must be installed correctly. Otherwise, it will not withstand external pressure and will collapse, or the drainage of precipitation and groundwater will not be fully carried out.

They will wash away the entrance embankment and cause an emergency. This article will tell you how to properly lay a pipe in a ditch.

Materials and types

The weight of the earth puts pressure on the pipes laid in the ditch. Even if a concrete bridge is poured on top of them, it only redistributes this load, but cannot completely eliminate it. Therefore, for hidden installation, pipes with a sufficient level of ring rigidity are required.

In addition, they are negatively affected by groundwater, rain or melt water, and the cyclical nature of winter freezing. This means that the material used to make such products must be resistant to corrosion and able to withstand low temperatures.

The following types of pipes are suitable for such work:

  • Metal.
  • Concrete.
  • Reinforced concrete.
  • Made of plastic.

Metal

The steel pipe for laying in a ditch can be of different diameters and lengths, but it must be thick-walled and of good quality.

Metal products with such characteristics, despite the likelihood of corrosion, will last at least 30-40 years. However, due to the large weight of metal pipes, lifting equipment will be required during their installation.

Concrete

Concrete pipes are placed in ditch more often than others, since they have a large capacity.

Concrete perfectly resists the effects of aggressive environments, withstands significant loads and serves for a long time. However, due to the large weight of such structures, their independent installation is unlikely to be feasible.

Reinforced concrete

They are manufactured at reinforced concrete factories by vibrocompression from heavy or fine-grained concrete, reinforced with reinforcing cages made of steel rods of classes A-1 and A-III.

Reinforced concrete products ensure free transportation of wastewater and are suitable for any climatic conditions. The length of the segments ranges from 6 to 10 m.

Among reinforced concrete pipes, according to their load-bearing capacity, there are 5 groups with a permissible height of backfilling with soil of no more than 2, 4, 6, 8 and 10 m. For laying in a ditch, you can take a pipe from group 1.

It is capable of withstanding the pressure of a soil layer up to 2 m high. For most regions of our country, where soil freezing is no more than 1.5 m, this will be sufficient. Products of group 2 have a higher load-bearing capacity.

They can be laid to a depth of up to 4 m. However, such structures are quite fragile, so they must be laid on a sand bed and protected from weight loads with a layer of sand on top.

Plastic

For underground installation, corrugated plastic pipes are produced, which are much lighter and cheaper than other analogues. Their throughput and ring rigidity are sufficient for placement in a ditch.

They do not rust, are durable and easy to install. They also need to be placed on a sand cushion with a layer of geotextile, and covered with sand and crushed stone on top.

Tips for choosing a pipe

In addition to choosing the pipe material, it is important to correctly determine its diameter.
Correct calculation of the channel cross-section will allow melt and rain water of any intensity to freely pass beyond the site. If there is a danger of large debris getting into the cavity of the structure, then protective steel grilles must be installed on both sides.

Considering that reinforced concrete structures are labor-intensive to install, and metal structures are susceptible to corrosion in damp conditions and are also expensive, the best option for installing a drainage ditch would be a plastic corrugated pipe. It is easy to cut and installed without the use of special equipment.

For a ditch, you can take a sewer two-layer corrugated pipe made of polypropylene PP (PP) (Pragma) or high-strength polyethylene (Corsis Pro) with a smooth inner surface and a structured outer wall. These materials perfectly withstand external pressure and low temperatures, do not rust, and are resistant to aggressive environments.

Requirements for manufacturing and installation

According to the standard, steel molds must be used in the manufacture of culvert pipe links. The non-metallic option is permitted only if it is able to ensure compliance with all GOST requirements.

The strength of the products should ensure the possibility of operation under the calculated thickness of bulk soil and a properly prepared base. As for joining and sealing links during pipe installation, the quality of these operations must comply with the requirements of standard 6485 (clause 4.5), which apply to all free-flow pipes.


GOST 6485 requirements for connections of non-pressure pipes

According to the standard, only heavy concrete should be used for the manufacture of culvert elements:

  • class minimum B25;
  • frost resistance F200;
  • with a water resistance coefficient of W6 (and for the northern regions W8).

Its tempering strength under normal conditions is 70%, and for products operated at critically low temperatures – 100%.

Nuances of installing culverts

There is a technological map for the installation of pipes with a meter diameter. This is a good instruction for those who are planning to install such a pipe themselves. You can also watch the video in this article. We will offer only a brief overview of the process.

Criterias of choice

When purchasing a pipe for driving through a ditch, you should take into account the following indicators:

  1. Ability to withstand heavy loads. Trucks and special equipment can enter the construction site, so such a product must have high mechanical strength to withstand the pressure of heavy vehicles and embankment material weighing several tens of tons.
  2. Trench dimensions. The volume of passing wastewater directly depends on them. To ensure that the drains do not erode the embankment, but completely leave the ditch, the pipe must be of a suitable diameter.
  3. Cost indicators. There are many types of pipes on the construction market that can be used for laying in ditch. The choice often depends on the financial capabilities of the owner.

Installation of culverts under the road

The technology for constructing drainage channels under the road includes several stages:

  1. Preparing the pit.
  2. Pouring the foundation.
  3. Pipeline laying.
  4. Construction of a road embankment.

The first step is to dig a pit, the dimensions of which coincide with those calculated during the design. It is also important to take into account the soil that prevails on the site - unsuitable soil may prevent the construction of a heavy structure. In addition, the type of soil directly affects how the walls of the pit will be constructed.

Design

When drawing up a project, it is important to correctly determine the width of the entrance to the site. It must be at least 4 m to allow passage of not only cars, but also trucks.

An additional one meter of protective zone must also be provided on each side. This means that a product with a length of 6 m must be placed in the ditch. The diameter is selected based on the amount of wastewater.

In spring, melt water should fill the pipeline no more than ¼ of the volume. Typically, a product with a diameter of 300 to 500 mm is installed.

The ditch profile should have the shape of an inverted trapezoid with a flat bottom and be 10–20 cm wider than the laid structure on each side. To prevent the pipe from being sucked into the ground during operation, the bottom is deepened by 25 cm.

The resulting pit is filled with crushed stone and compacted. The depth of the ditch should be at least 150–170 cm, depending on the thickness of the layer that freezes in winter.

The pipe itself in the ditch must have a strictly horizontal position or be located with a slope of 2 cm in the desired direction. Sometimes a concrete bridge is poured over the top of the trench to distribute the load.

Standard moving option

Crushed stone is used for the base, and it is laid and compacted not only at the bottom of the ditch, but also on slopes. Concrete can be prepared on site and poured into prepared formwork. If the wall thickness is less than 400 mm, then a frame made of reinforcement is required. The wall thickness must be at least 25 cm.

Above the pipe, near the masonry or concrete wall, it is worth making a gap of 5–10 cm, which is sealed with soft insulating material. This will prevent the wall from affecting the ends of the pipe if there is slight subsidence, and will protect it from breaking into two parts. Particularly important for concrete collectors.

To prevent the car from sliding off, you should raise the wall above the roadway by 15 cm.

Required tools and materials

In addition to the pipe itself, the following materials are needed:

  • Crushed stone.
  • Sand.
  • Geotextiles.
  • Concrete.
  • Reinforcement and binding wire.
  • Boards for formwork.
  • Nails.
  • Paving slabs or asphalt concrete mixture.
  • Curbs.
  • Two decorative grilles to protect the pipe cavity from blockages.
  • Moisture-loving plants for beautifying the entrance: irises, asters, vines, peonies, etc.

To dig a trench you need an excavator with a bucket capacity of 0.4–05 m3, and to lay heavy pipes made of metal or reinforced concrete - a truck crane. In addition to special equipment, you will need the following hand tools and accessories:

  • Shovels - bayonet and shovel.
  • Manual tamping.
  • 2 buckets.
  • Container for preparing concrete mixture.
  • Vibrator for uniform concrete placement.
  • Hammer.

Laying technology

The step-by-step installation technology is as follows:

  1. Marking the area for the ditch and trough of the driveway embankment.
  2. Digging a trench with sloped walls and cutting the soil around it to a depth of 35–40 cm.
  3. Cutting pits along the bottom of the trench and on the side walls.
  4. Compaction of soil at the bottom of pits.
  5. Filling the lower pit with crushed stone with layer-by-layer compaction.
  6. Construction of a crushed stone cushion 15–20 cm thick.
  7. Laying a layer of geotextile to prevent sand from going into the ground.
  8. Installation of a sand cushion 15–20 cm thick across the entire width of the ditch.
  9. Pipe installation.
  10. Installation of formwork and knitting of reinforcement cage for concrete caps.
  11. Pouring concrete into formwork with compaction using vibrators.
  12. Filling the ditch with a layer of sand 10–15 cm thick.
  13. Wrapping the edges of the geotextile fabric.
  14. Filling side pits with crushed stone.
  15. Backfilling of the trench with sand and soil with layer-by-layer compaction.
  16. Installation of a sand cushion under the embankment along the ditch.
  17. Laying geotextiles on a sand layer.
  18. Construction of a crushed stone base for the road.
  19. Road surface devices for crossing a ditch.
  20. Installation of curbs.
  21. Dismantling formwork from the ends.
  22. Layout of the site and layout of the flower bed.
  23. Planting and watering plants.

Basic mistakes when laying pipes in a ditch

  1. Ditch section of insufficient depth.
  2. Laying the pipe directly on the ground, backfilling with local soil.
  3. Lack of layer-by-layer compaction of underlying layers.
  4. Using coarse crushed stone for backfilling. Under the pressure of heavy equipment, the edges of the crushed stone can damage the outer surface of the pipe, causing the wall to rupture.
  5. Installation of a pipe with a slope in the opposite direction.
  6. Small thickness of sand layers.
  7. Lack of protective structures on the sides of the ditch and embankment.

Ways to build a parking lot

Parking using crushed stone

This method is low-budget. This kind of car parking at the dacha has excellent water throughput, and, in addition, it does not crack. A negative aspect of such a parking lot can be considered an uneven surface, which will make it very difficult to clear snow from it in winter. The thickness of the base layer should be 0.2 meters. For the main surface layer, a mixture of sand and gravel is used.

Parking using paving bricks

For this type of parking, a mixture of sand and gravel is used; it is installed with a slight recess under the paving bricks. This material creates a smooth surface, without the formation of dust and cracking of the canvas in winter.

Paving bricks can pass water well, so it does not stay on the surface for too long.

Some builders recommend laying paving bricks on cement. But after a certain time, the cement will begin to crack, which will lead to poor water infiltration. The traditional technology for laying paving bricks is on sand or its mixture with gravel.

To prevent the destruction of the parking lot over time, its main (bearing) layer is created in the pit. You need to pour about 0.1 meter of sand into it and compact it well.


compacting sand for a parking lot at the dacha

When calculating the depth of the pit, the thickness of all its layers is taken into account. The sand and gravel mixture requires careful compaction. A layer of geotextile is laid on top of it, as well as in the middle.

It is important that in the autumn-spring period the supporting layer is under no circumstances exposed to moisture. If this does happen, and the parking lot itself is located in a low area, then you should take care of the drainage system and good drainage in advance

Concrete parking lot

A concrete parking lot is one of the most durable and long-lasting options. When arranging it, the most varied cladding can be used. The base of such a parking lot is very strong, which allows the use of stone - natural or artificial - for cladding. This coating is laid using a special tile adhesive, which has good resistance to frost.


Concrete parking lot project

To prevent rain or floods from creating problems in the parking lot, when pouring the concrete mixture, you need to provide slight slopes for water drainage. And in order to avoid compression of concrete during temperature fluctuations, expansion joints must be made on its surface every five meters.

How to save an embankment from erosion

To protect the embankment from erosion, its sides and longitudinal slopes are reinforced with various materials:

  1. For the construction of the sides, natural stone, white sand-lime brick or reinforced concrete slabs are used. Brick or stone walls are placed on both sides of the ditch. In this case, the ends of the pipe are left free. If it is necessary to strengthen the sides with concrete, then first install formwork with supports. A reinforcement cage is installed between the walls of the formwork, then the structure is filled with concrete. A week later, after the concrete mixture has set, the formwork can be removed from the top.
  2. Along the ditch, the slopes are reinforced with crushed stone and poured with cement mortar, carefully compacting each layer.

Foundation installation

If the foundation consists of prefabricated reinforced concrete slabs, then the first step is to install the links that will form the head of the future culvert. The blocks are laid down to the level of the sole, and then work is done to fill the sinuses to the same level.

Concrete blocks or slabs are used to install the foundation

Let's consider the main stages of arranging a monolithic foundation:

  1. First of all, you need to make or purchase ready-made formwork.
  2. Next, the concrete solution required for pouring is prepared.
  3. At the third stage, the concrete solution prepared in advance is poured into the formwork.
  4. When the solution hardens, it is necessary to dismantle the formwork and fill the formed sinuses.
Rating
( 1 rating, average 5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]